Bir Hassan Project

Project Details

  • Bir Hassan Project
  • Lebanon - Beirut

Telecom & Security Systems

  • Structured Cabling : Installation – Termination- Labeling – Testing for (3000*Cat6ACable/500*Fiber Pigtail)
  • Fire Alarm Security System : Installation – Programing for (500*Fire Detector)
  • Intrusions Alarm System: Installation – Programing for (120*Detection Alarm)
  • Conference Room: Installation – Programing for Conference Rooms
  • Public Address Security System :Installation – Programing For (150*Speakers)
  • BIS Integration Software: Integration between (Fire Alarm System – Intrusion Alarm – Public Address System)